How It Works

A stack of green metal scaffolding parts on a concrete surface outdoors.

Fast, Controlled and Predictable

Alt.Form supply and manufacture our prefabricated panelised building system, enabling developers and builders to meet tight programs with reduced risk.

Our process focuses on four critical stages designed to reduce build timeframes and maximise delivery certainty.

Close-up of a building framing with glass windows, green and blue structural elements and tree reflections.

THE ALT.FORM PROCESS FLOW

STEP 1: DESIGN AND REVIEW

• All design and documentation locked in.
• Design review, including grid review and design freeze to enable material selection.
• Triggers manufacturing commencement.


STEP 2: MANUFACTURE

• Panels move into Alt.Form’s production line.
• Typical manufacturing cycle: just days per 100–120m² home.
• Factory-controlled QA on every panel.


STEP 3: INSTALL

• Panels delivered to site in sequence.
• Fixed Alt.Form install partners complete frame assembly in as little as 5–7 days (Class 1a and 1b builds).
• Zero wet trades post-install.


STEP 4: HANDOVER

• Panels are pre-sequenced to enable fast fit-off and finishing stages.
• Reduced risk of program overruns.
• Your project moves rapidly toward completion.

Construction site with a modern building, scaffolding, and reflective windows under a clear blue sky.

Speed Metrics

10–15 Day Installs

  • From slab to complete envelope in under a week. No waiting, no weather delays.

65% Faster Envelope Time

  • Accelerated programs from design freeze to handover — slashing holding costs.

Zero Wet Trades Post-Structure

  • Cladding, linings, insulation. All pre-installed in-factory. Faster fitout. Cleaner sites.

 Sales-Aligned Production

  • We match your sales velocity. Delivering just-in-time panels for estate rollouts.

 Your Designs, Uncompromised

  • Your plans, your look. Just delivered faster, with full compliance (Class 1a, BAL-29).

Repeatable, Scalable, Reliable

  • Ideal for high-volume precincts, duplexes, and turnkey portfolios. 

Risk Reduction

Alt.Form’s Factory-Controlled manufacturing and fixed install methodology dramatically reduce:


• Weather delay risks
• Subcontractor interface issues
• Site management complexity

For builders and developers, this translates to greater program control and reduced holding costs.

Large white construction banner displaying the name, Alt.Form. The banner is attached to a construction site fence, with some trees and a sidewalk visible in the background.
Construction site frame, blue sky and trees.

Buildability – Designed for Site Reality

Our system isn’t just fast—it’s buildable.

We design every panel, joint, and connection point with site installation in mind.

For developers and builders, this means:
• Less on-site rework
• Clear install sequencing
• Fewer critical path dependencies

If your project needs faster delivery, less program risk and a reliable building system, talk to us today.